Before we supply the Commercial System (Mat & Base Coat)

    To confirm suitability and site conditions, customers must complete two short steps before Honcho Supplies can supply the Skudo HT Commercial System:

    Important considerations before you begin

    • We recommend a minimum of 21 days cure time prior to the application of the Skudo HT Commercial system (base coat and mat), and 14 days for loose lay. We also recommend loose lay application over geo fabric.
    • We recommend moisture testing with a moisture meter, such as a Wagner Meter, to confirm surface pH is below 11.0 and relative humidity (RH) is 80% or lower, before the application of surface protection.
    • We recommend watching the application videos and reading the product and application sheets available on the website prior to application.
    Your details
    Slab details

    e.g. polished, burnished, steel trowel

    If you have a TDS (technical data sheet) for this product, please email it to info@honchosupplies.com.au referencing your company name.

    If you have a TDS (technical data sheet) for this product, please email it to info@honchosupplies.com.au referencing your company name.

    If you have a TDS (technical data sheet) for this product, please email it to info@honchosupplies.com.au referencing your company name.

    e.g. foot traffic, vehicle, plant/machinery